Full Home Remodeling in Valley Village
Full home remodeling in Valley Village, CA, with supply lines, drains and wet rooms rebuilt while the walls are open and visible.
Water inside the walls of a Valley Village house does its damage slowly, so a whole-house remodel is the right time to settle the plumbing. Supply lines get a pressure check, drains get a camera look, and every fixture gets its own shutoff valve. Wet walls around showers and tubs are built with a waterproof layer before tile goes on.
Supply and drain lines
Supply pipes that show pinhole leaks or rust-colored water are replaced while the walls are open, with PEX or copper. Drains that run slow or sag are rerun with proper slope and cleanouts. A main shutoff, with a pressure regulator where needed, goes at the house entry. Vents are checked as well, since a blocked vent slows drains and lets sewer odor into rooms. A water heater that moves gets its own gas and drain sheets in the permit set.
Wet rooms built to stay dry
Showers get a sloped mortar bed or a foam pan with a membrane, tested by flooding it before tile. Bathroom walls use cement board or a bonded membrane. Fans vent through the roof or an exterior wall, with the duct ending outdoors. Under sinks and behind the washer, drain pans with leak sensors can be added. LADBS handles permits for Valley Village, and the inspector signs off on plumbing before the walls close. Pressure tests are run with the pipes still exposed, so a weeping joint is found before drywall hides it.
About our full home remodeling workEverything we build in Valley Village
Full Home Remodeling in Valley Village: questions
Interior partitions carrying only pipes and wires come out after those lines are rerouted. Bearing walls and the wall at a split-level change get beams, posts or bracing designed by the engineer first. Plumbing stacks often sit inside those walls, so the structural decision and the plumbing route are settled together.
Water shutoffs set the phasing. Water to one bathroom and the kitchen stays live while the other wet rooms are rebuilt, then the roles swap. Demolition and structure start the job, rough plumbing and electrical follow, then insulation, drywall, tile and fixtures. The phase plan is part of the written scope.
Yes. Framing, beams, posts and footings have their own lines. Plumbing is listed separately as well, with pipe replacement, drains, valves and shower pans broken out. Tile, fixtures and paint close out the finish group.