Valley Village New Construction Finished in the Right Order
New Construction in Valley Village finished in order: cabinets set before counters are templated, then trim and fixtures, HERS checks, finals and occupancy.
Stone counters for a new Valley Village house cannot be measured until the cabinets under them are set, shimmed level and fastened. That kind of dependency runs through the whole finish stage. Drywall and primer come first, then cabinets, then templates for the counters, then tile and the plumbing and electrical trim, and the floors and final paint wait until the heavy trades are gone.
From drywall to trim
Once the board is taped and primed, the cabinet installer sets the boxes to a laser line and anchors them to blocking framed in earlier. The fabricator then templates the tops, marking sink and cooktop cutouts from the actual fixtures, so those fixtures are on site before the template visit. Backsplash tile follows the counters, and finish carpenters hang doors and run base and casing. Plumbers set fixtures, electricians install devices and lights, and the mechanical contractor sets grilles and the thermostat.
Final inspections and occupancy
Plumbing, electrical and mechanical finals come ahead of the building final. A HERS rater completes any field checks the energy forms call for, and the results are registered before the inspector signs off. As part of the City of Los Angeles, Valley Village falls under LADBS, which performs these finals and issues the certificate of occupancy for a new house, and the utilities wait for its release before setting their service. Flooring and the last coat of paint go in near the end, and a walk-through list closes the job.
About our new construction workEverything we build in Valley Village
New Construction in Valley Village: questions
Boundary lines, the existing ground and anything to be removed are mapped by a licensed surveyor, and a soils engineer drills borings for the foundation design. Those set the floor height, which matters at the very end too, since the step down at each exterior door has to stay within code once flooring and thresholds are in.
Stone slabs for counters travel on an A-frame and are carried in by hand, already cut, so the path from the truck to the kitchen counts. A wide side gate and a straight route keep that a short visit. A tight turn or a long carry may force an extra seam or more carriers, and the fabricator's figure reflects it.
Yes, and we ask for the appliance specification sheets with the set. A range's gas input, an induction cooktop's circuit, a built-in refrigerator's opening and a hood's duct size each change framing, wiring or gas piping. With those sheets in hand, the kitchen is priced to the real equipment, and later swaps show their effect clearly.