Bathroom Remodeling in Woodland Hills
Woodland Hills bathroom remodels that start with the floor, valves and wall cavities, then rebuild the waterproofing and drain before any tile is set.
Pressing a boot heel along the floor beside the tub tells a lot, and that is where a visit to a Woodland Hills bathroom starts. Soft spots point to rot in the subfloor, and a floor that feels solid points elsewhere. After that we look at the shutoff valves, the vent route and the wall behind the shower, since each one decides how much of the room can stay as it is.
What sits under the tile
A shower holds up when its hidden layers are right. The floor is shaped to fall toward the drain, a membrane covers it and rises up the walls past the showerhead, and the seams and valve openings get reinforcing strips. Once the membrane cures, the pan is flooded and watched before a single tile goes down. Cement board or a foam substrate lines the walls, and the old pipes behind them are replaced if they show corrosion or wear, since they will sit behind new tile for decades to come.
Level entry and the framing
A curbless shower asks the floor to drop. On a slab, the drain can sit lower without much trouble. On a raised floor, the joists under the shower may have to be notched or reframed, and the building department can ask for an engineer's note on that. Plumbing for the new valve and drain gets moved before the walls close. A site look settles whether the level entry is practical or whether a low curb is the sound answer for that particular floor.
About our bathroom remodeling workEverything we build in Woodland Hills
Bathroom Remodeling in Woodland Hills: questions
Often, but it depends on what lies under the floor. A slab lets the drain sit lower with little fuss. A raised floor may need joists dropped or notched, and an engineer can weigh in on how much can be cut. We look at the framing in person before promising a flush threshold.
The shower floor is built as a sloped pan that leads to the drain, then covered with a continuous membrane that climbs the walls above head height. Corners and the valve openings get reinforcing strips. Before tile goes down, the pan is filled with water and left to show whether it holds.
It separates demolition, plumbing, waterproofing, electrical, tile, fixtures and finish carpentry so each trade can be read alone. Tile and fixture choices carry named allowances. Anything found behind the walls, such as rotted framing, is priced as its own line once it is exposed, and does not get buried in a lump sum.
Bathroom Remodeling in other cities
More work in Woodland Hills
Planning work in Woodland Hills?
Tell us about the lot and the job. A builder replies by phone or email to set up a visit.

