ADU Construction in Northridge, Starting With the Soil

Northridge ADUs that begin with a probe rod at the corners of the footprint, footings designed for what the soil shows, and plan review through LADBS.

Tell us about the lot and the job

A builder reads it and calls or emails you back. Nothing is booked until you agree to it. How we use your details.

To send, add your first name and a phone number or an email.

A steel probe rod is the first tool we push into a Northridge yard, at each corner of a likely ADU footprint. How easily it sinks tells us whether the top layer is firm native ground or soft fill, and a few auger samples show whether clay is present. Those readings come before layout, because poor soil can move the unit or change its whole foundation.

What a weak reading changes

Soft fill cannot carry a standard footing, so the design digs through it to firm soil, removes and recompacts it, or carries the unit on drilled piers. Expansive clay, which grows as it takes on water, may call for deeper footings, extra reinforcing steel and a slab built to ride out the movement, with the ground around it sloped so water stays away. When the probe raises doubt, a geotechnical engineer drills borings and runs lab tests, and the report sets the bearing value the structural design must use. On a sloped yard, the report also covers how any cut or fill will behave.

Plan check for a Northridge lot

Plans for a Northridge unit are reviewed by LADBS. A soils report filed with the plans goes to the department's grading section, which can approve it with conditions that the footing design then has to meet. The plan checker also reads the setbacks, the spacing between the unit and the main house and the route emergency crews would use to reach the door. Before concrete, the soils engineer usually has to observe the open footing trenches and confirm they reached the soil the report described.

About our adu construction workEverything we build in Northridge

ADU Construction in Northridge: questions

Planning work in Northridge?

Tell us about the lot and the job. A builder replies by phone or email to set up a visit.