Kitchen Remodeling in Van Nuys, Epoxy Grout at the Range
Van Nuys kitchen remodels that use epoxy grout and sealed tile behind the range and sink, built to handle grease, acid and bright inland sun.
Cement grout drinks in oil and tomato juice, so behind the range in a Van Nuys kitchen we set tile with epoxy grout, which stays sealed against grease and acid and wipes clean with a damp cloth. The same choice suits the sink wall. Dry inland heat does not bother it, and sun through a window will not fade the color the way it can fade dyed cement grout.
Backsplash and counter edges
Epoxy grout comes as a two part mix, and it sets quickly, so the tile setter works in small sections. The joint between tile and countertop stays flexible with a matching sealant, since a rigid fill would crack when the cabinets settle. Large format porcelain tile cuts down the number of joints altogether. Behind a gas range the tile runs up past the hood's lower edge, and a metal or tile trim protects the cut edge at the end of the run.
Surfaces beside the window
A sink under a window sees direct sun for hours, along with splashes. Quartz counters can discolor in constant sun if the resin is heavy, so a mineral rich slab or porcelain suits that spot better. Stainless sinks with a brushed finish hide fine scratches. Painted trim around the window takes a hard enamel that wipes clean at the sill. Each material is named in the scope with its location, so a swap is easy to price, and the grout color is chosen from a sample board before the tile is set.
About our kitchen remodeling workEverything we build in Van Nuys
Kitchen Remodeling in Van Nuys: questions
On a raised floor, the framing beneath the island is measured and compared with the weight of the stone and cabinets. Reinforcement can take the form of added joists beside the old ones, or a girder carried on new posts. On concrete, we look at levelness and cracks. Repairs appear as their own quote lines.
Systems and structure set it off: new circuits, moved plumbing, gas piping, a hood duct, or a wall coming out. Surface-only updates may not. Van Nuys is permitted through the City of Los Angeles, where LADBS handles review, and your address is checked against the scope before any number is final.
Think of the quote as a set of stacks. Structure holds beams, joist repairs and footings. Systems holds demolition plus new plumbing, gas and electrical lines. Finishes holds cabinets, counters, tile and grout. Picking epoxy grout, or a different slab, changes the finishes stack and leaves the structure stack untouched.
Kitchen Remodeling in other cities
More work in Van Nuys
Planning work in Van Nuys?
Tell us about the lot and the job. A builder replies by phone or email to set up a visit.

