Sunland-Tujunga Fire Rebuild & Reconstruction
A Sunland-Tujunga fire rebuild that starts with a pit dug beside the old footing, then ember-resistant materials, LADBS plans and a written quote.
A shovel and a tape come out before any quote on a Sunland-Tujunga fire lot. We open a pit against the outside of the old footing to read its depth, its width and the soil under it, and we push a probe rod across the pad to find soft pockets. Those numbers tell the engineer whether the old foundation earns lab testing or a soils report should come first.
Reading the pit and the pad
Firm native soil under a footing gives the engineer something to work with. Loose fill, damp clay or a gap beneath the concrete points toward new footings, and sometimes toward drilled piers. Burned roots can leave tunnels under a slab that only a probe finds. If the lot slopes, the pit also shows how far the footing sits from the face of the grade, a setback the building code limits. Each pit is photographed with a tape in the frame and logged on the site plan, and the log goes to the engineer with the survey.
Ember-resistant construction
Sunland-Tujunga has land inside mapped fire hazard zones, and where a lot falls inside one, the plans call for a Class A roof, vents listed to resist embers, enclosed eaves, noncombustible or ignition-resistant siding and dual-pane glass with at least one tempered pane. Any deck that touches the house is built from ember-rated boards. LADBS checks each listed product at plan review, and the field inspector compares the installed part with the sheet. Naming every product on the plans keeps a cheaper substitute from slipping in during construction.
About our fire rebuild & reconstruction workEverything we build in Sunland-Tujunga
Fire Rebuild & Reconstruction in Sunland-Tujunga: questions
That depends on the engineer's review of the pits, the cores and any exposed steel. Concrete that sat in long, intense heat can weaken near the surface while still looking whole. Where the foundation steps, each level is judged separately, so an upper run may stay while a lower one is replaced, with doweled joints where old concrete meets new.
The permit plans and the engineer's notes drive our numbers, and every line is paired with the matching entry in your insurance scope. Soil work, piers and ember-resistant upgrades are the items an early scope tends to miss, so each appears as its own line with the report page or code requirement behind it. That way, every added line points to a document.
Both the state and the City of Los Angeles map fire hazard by parcel, and we pull this lot's status from each before design. Inside a very high hazard zone, the wildfire chapter governs every exterior surface and opening, and the city's brush clearance rules set how far vegetation is kept back. Outside one, ember-resistant parts become your choice, and the regular code covers everything else.