Sunland-Tujunga Decks & Patios, Access Measured First
Sunland-Tujunga decks and patios quoted after the way in is measured: gate width, path steps and grade, then footings, framing and ember-rated decking.
The route from the curb to the deck site is the first thing we measure on a Sunland-Tujunga lot. Gate width, the steps along the path and the fall of the ground tell us whether a compact drill rig can reach the footing spots or whether holes are dug by hand, and how lumber, concrete and rated boards get carried in. Access sets how the dig is done, and it shows up as its own line in the quote.
From the path to the footing layout
Once access is known, the footprint is staked and the grade is shot at every post location. If the lot slopes, the difference between the uphill and downhill posts sets their lengths and the bracing between them. A hand auger run at a few spots shows whether the top layer is loose or whether rock sits close under it. When a truck cannot get near, concrete can be pumped through a hose from the street, and the pump becomes part of the plan. The engineer then designs footings around what can actually be drilled or dug at each spot, and those details go into the LADBS permit set.
Ember rules where the map applies
Fire hazard mapping covers sections of Sunland-Tujunga, which can bring ember-resistance rules to a lot there, so its map status is settled before a board is picked. Where the map applies, the deck surface must be a product tested for ember and flame exposure, such as certain composites, exterior fire-retardant treated lumber or dense hardwoods that pass. The underside is either enclosed with noncombustible material or kept clear of anything that can burn. Where the deck meets the wall, metal flashing closes the gap. A concrete or stone patio sidesteps most of this, since neither material burns.
About our decks & patios workEverything we build in Sunland-Tujunga
Decks & Patios in Sunland-Tujunga: questions
The soils engineer gives a minimum embedment into firm material, and each pier goes until it gets there, however far that turns out to be. Where rock sits near the surface of a Sunland-Tujunga lot, a pier may be shorter but cored into the rock. Where access allows hand digging alone, the design is drawn around a diameter a person can dig.
For a mapped Sunland-Tujunga parcel, the state's wildland-urban interface rules reach the deck. The decking must carry a listing for the ember and flame tests, and the plans name it by product. Anything that burns is kept out from under the frame, or the underside is closed in. An attached patio cover may face the same review. An unmapped lot follows the general deck code.
Both, and on a mapped parcel they interact. Rated decking raises the cost of each square foot of surface, so area weighs more. An enclosed underside grows with height, since a taller deck has more skirt to close in with noncombustible panels. Access, hand digging and any concrete pump sit on separate lines of their own.