New Construction in Marina del Rey

New houses in Marina del Rey planned around what sits along the property lines: neighbor footings, test holes and county plan check, priced in writing.

Tell us about the lot and the job

A builder reads it and calls or emails you back. Nothing is booked until you agree to it. How we use your details.

To send, add your first name and a phone number or an email.

A neighbor's footing that pushes past the shared line stays hidden until a test hole opens beside it. On a new Marina del Rey house, that discovery redraws the foundation along that side. Our footing cannot bear on theirs, so the engineer moves it inward as an offset footing tied back by a grade beam, and the wall above may step in with it. We dig those test holes at the lines before the foundation is priced.

Building tight to a shared line

When the survey puts a new wall close to the property line, the excavation runs right beside whatever holds up the adjoining house. If test holes show the neighbor's footing is shallow, the soils engineer may limit how deep our trench goes and how long it stays open, or call for digging in short sections, each poured before the next one opens. Footings near the line are often drawn as eccentric footings, with a grade beam carrying the load back to an interior pad. Each of those choices adds concrete and steel, so the foundation line in the quote names the side of the house that carries it.

County plan check for an unincorporated parcel

Los Angeles County Public Works issues building permits for unincorporated communities, Marina del Rey among them, and its inspectors follow the job from footings to final. The county reads the soils report against the foundation sheets, and on a coastal parcel that report may also cover liquefaction and the soil's corrosion potential for buried steel. The official coastal zone map is read for this parcel at the outset, since parcels within that boundary can require coastal approval before the building permit issues. Exposed connectors and flashing are specified in stainless or hot-dip galvanized grades, because salt in the air shortens the life of plain steel.

About our new construction workEverything we build in Marina del Rey

New Construction in Marina del Rey: questions

Planning work in Marina del Rey?

Tell us about the lot and the job. A builder replies by phone or email to set up a visit.