New Construction in Marina del Rey
New houses in Marina del Rey planned around what sits along the property lines: neighbor footings, test holes and county plan check, priced in writing.
A neighbor's footing that pushes past the shared line stays hidden until a test hole opens beside it. On a new Marina del Rey house, that discovery redraws the foundation along that side. Our footing cannot bear on theirs, so the engineer moves it inward as an offset footing tied back by a grade beam, and the wall above may step in with it. We dig those test holes at the lines before the foundation is priced.
Building tight to a shared line
When the survey puts a new wall close to the property line, the excavation runs right beside whatever holds up the adjoining house. If test holes show the neighbor's footing is shallow, the soils engineer may limit how deep our trench goes and how long it stays open, or call for digging in short sections, each poured before the next one opens. Footings near the line are often drawn as eccentric footings, with a grade beam carrying the load back to an interior pad. Each of those choices adds concrete and steel, so the foundation line in the quote names the side of the house that carries it.
County plan check for an unincorporated parcel
Los Angeles County Public Works issues building permits for unincorporated communities, Marina del Rey among them, and its inspectors follow the job from footings to final. The county reads the soils report against the foundation sheets, and on a coastal parcel that report may also cover liquefaction and the soil's corrosion potential for buried steel. The official coastal zone map is read for this parcel at the outset, since parcels within that boundary can require coastal approval before the building permit issues. Exposed connectors and flashing are specified in stainless or hot-dip galvanized grades, because salt in the air shortens the life of plain steel.
About our new construction workEverything we build in Marina del Rey
New Construction in Marina del Rey: questions
A boundary survey showing the neighbors' walls and the edges of any structure near the lines comes first, then a soils report from borings. Test holes beside the shared lines tell the engineer how deep the adjoining footings run. A check of the coastal zone map belongs in the first round, and an existing house on the lot adds asbestos and lead sampling.
Tight side yards along a shared line limit how equipment reaches the foundation. Where a full-size excavator cannot fit between the houses, the dig near the line is done with a mini excavator or by hand, and concrete goes in by pump. Deliveries share the frontage with parked cars, so drop times are planned. Each of those methods carries its own price in the quote.
Yes, when the set carries structural calculations and a soils report. We compare the foundation plan with what the test holes found at the lines, and if the drawings assume a footing the neighbor's foundation will not allow, we raise it before pricing. Any choice the architect has left open is held as a named allowance.