Agoura Hills Decks & Patios, Rebuilt in Sequence

Agoura Hills deck rebuilds in sequence: old deck removed, house rim inspected, new footings poured, then frame, ember-rated boards, guards and final.

Tell us about the lot and the job

A builder reads it and calls or emails you back. Nothing is booked until you agree to it. How we use your details.

To send, add your first name and a phone number or an email.

Replacing a worn deck in Agoura Hills starts with taking the old one apart down to its footings. The ledger comes off next so the house rim behind it can be examined, and any soft wood is repaired before anything new attaches. After that the order is fixed: new footings, inspection, framing, a second inspection, boards and guards. A fire hazard check on the parcel happens before the material list.

Removal and the house wall

Boards come up first, then joists, beams and posts, with the house wall protected from swinging lumber. The old ledger is unbolted and the sheathing and rim joist behind it are probed. Rot or rusted bolts mean a section of rim is replaced and new flashing is set, which the inspector sees before cover. Old footings are tested against the new design, and undersized ones are broken out. Debris leaves the site as it comes off, keeping the work area clear for layout. Utilities are marked before any new hole is dug.

Footings forward to final

New footing holes are dug or drilled to the engineer's depth and inspected open. Concrete goes in with post bases set while it is wet. Posts, beams and joists follow, with hangers and lateral hardware, and the frame is inspected before boards hide it. Where an Agoura Hills parcel is within a mapped fire hazard zone, ember-rated decking goes down and the underside is closed in or left open with nothing stored beneath. Guards and stairs come last, then the final inspection by the city. Work in Oak Park or Westlake Village runs in the same order.

About our decks & patios workEverything we build in Agoura Hills

Decks & Patios in Agoura Hills: questions

Planning work in Agoura Hills?

Tell us about the lot and the job. A builder replies by phone or email to set up a visit.