Structural Work in Tarzana

Retaining walls, caissons, grade beams and framing repair for Tarzana houses, built in an engineered sequence and inspected by LADBS.

Tell us about the lot and the job

A builder reads it and calls or emails you back. Nothing is booked until you agree to it. How we use your details.

To send, add your first name and a phone number or an email.

In Tarzana, structural work begins with a decision about sequence. If the lot slopes, the retaining walls typically come before anything at the house, since they stabilize the ground new footings will bear on. On a flatter site, foundation repairs lead and the frame follows. Either way, engineering and permits are settled first, shoring goes in before old concrete comes out, and nothing gets buried until LADBS has inspected it.

Walls first on a grade

When the site falls away, the walls holding the soil take priority. A new or rebuilt wall is excavated, formed, reinforced and poured, then drained and backfilled in layers compacted as they rise. Only once that ground is stable do we open trenches at the house. Building in this order keeps a new footing from bearing on soil that could still move, and it gives equipment a firm pad to work from. The engineer writes the sequence onto the drawings, so the inspector expects it too.

Then the house

With the ground secure, house work starts by jacking and cribbing the floor where an existing footing will be cut out. New footings or caissons go in next, followed by grade beams tying them together. Anchor bolts, hold-downs and shear panels connect the frame to the new foundation, and cracked plaster or drywall is patched at the end. Jobs in Encino, Reseda and Woodland Hills are run in that order and pass through LADBS as well, since each sits inside the City of Los Angeles.

About our structural work workEverything we build in Tarzana

Structural Work in Tarzana: questions

Planning work in Tarzana?

Tell us about the lot and the job. A builder replies by phone or email to set up a visit.