Fire Rebuild & Reconstruction in Inglewood

Fire rebuild and reconstruction in Inglewood, with Type X gypsum sheathing, rated walls near the lot line and a tested foundation under the new shell.

Tell us about the lot and the job

A builder reads it and calls or emails you back. Nothing is booked until you agree to it. How we use your details.

To send, add your first name and a phone number or an email.

Type X gypsum sheathing, fastened under the siding of a rebuilt Inglewood house, slows heat from passing through the wall when a neighbor's garage or a dry hedge along the fence catches fire. It is also the layer an inspector can see before the finish goes on. On a wall close to a side lot line it can form part of the 1-hour assembly code may require. If the lot slopes, the same board wraps any exposed cripple wall on the low side.

Wall assemblies by distance

How near a wall stands to the property line decides what that wall has to be. Code ties the fire rating of an exterior wall to that distance, and close to the line it also limits openings, so a window there may shrink or move. We mark each face of the house with its distance on the site plan, then choose the build-up: studs, insulation, gypsum sheathing and a siding of fiber cement or cement plaster. Eaves and vents on a close wall get their own detail, since heat finds them first. The engineer's shear nailing is drawn on the same sheathing plan, so the fire layer and the structural layer share the studs cleanly.

Pricing the shell in layers

The shell is priced layer by layer: framing, sheathing, weather barrier, siding, roof and windows, each with quantities taken from the plans. That lets you see what a change costs before it is drawn. Swapping wood trim for fiber cement, moving from asphalt shingle to concrete tile, or adding dual-pane tempered glass on the close walls each appears as a separate line. If the lot slopes, the cripple walls and any steel posts at the low side are priced apart from the main frame, because the engineer may revise them once the soil is checked. The material list stays tied to the approved sheets, so a later swap goes back to the City of Inglewood as a revision.

About our fire rebuild & reconstruction workEverything we build in Inglewood

Fire Rebuild & Reconstruction in Inglewood: questions

Fire Rebuild & Reconstruction in other cities

Planning work in Inglewood?

Tell us about the lot and the job. A builder replies by phone or email to set up a visit.